Our Vision is to continue serving our clients by creating a legacy of long-lasting, high-quality infrastructure while simultaneously developing a foundation for our future industry leaders to build upon.
Each project we build will exhibit our core values of:
- Safety For All
- Highest Quality Design & Construction
- Integrity Of Our Team
- Accountability To Each Other
Click below to read Testimonials
Alternate Water Feed to Downtown Augusta
Bid Item #20-181 Augusta, GA.
This project consisted of the installation of 10,814 lf of 24″ ductile iron pipe water main, 30″ and 24″ wet taps, fire hydrants, air release valves, 340 lf of 36″ jack, and bores, and over 13,000 sy of paving. LWG completed 78% of this contract with our own workforce.
LWG Project #1364
OWNER:
Augusta Procurement
535 Telfair St.
Augusta, GA. 30901
Mr. Chad Hendrix, PE
(706) 821-2811 / (706) 312-4126
ENGINEER:
Cranston Engineering
452 Ellis St.
Augusta, GA. 30901
Mr. Thomas Parrott
(706) 722-1588
SUPERINTENDENT:
Scott Hibbard
ORIGINAL CONTRACT AMOUNT:
$4,421,762.75
FINAL CONTRACT AMOUNT:
$4,233,750.81
ORIGINAL DURATION:
425 DAYS
ACTUAL DURATION:
425 DAYS
Completion Date:
May 3, 2022
_______________________
Legacy Water Group, LLC
10130 Bob Williams Parkway
Covington, GA 30014
(678) 712-2132
Coleman Road Forcemain Replacement
Lowndes Co., GA.
The project includes a sewer force main, steel casing, and a new pump station for Lowndes County. Installation includes approximately 19,786 lf of 24” HDPE force main and a new submersible pump station with a rated capacity of 2,250 GPM; 2,700 lf of 24” DR 9 HDPE directional drill and approximately 206 lf of DIP gravity sewer. Owner furnished HDPE pipe and submersible pumps.
LWG Project #: 1363
OWNER:
Lowndes County Board of Commissioners PO Box
1349/327 North Ashley Street, Valdosta, GA. 31601
Steve Stalvey, Utilities Director (229) 671-2527
F: (229) 671-2597
ENGINEER:
Lovell Engineering Associates
PO Box 2830, Valdosta, GA. 31604
3998 Inner Perimeter Road, Ste. C
Valdosta, GA. 31604
Clayton Milligan, PE
(229) 253-0900
F: (229) 253-1842
PROJECT SUPERINTENDENT:
Gregg Hibbard
ORIGINAL CONTRACT AMOUNT:
$4,693,069.00
FINAL CONTRACT AMOUNT:
$In Final Construction Stages
ORIGINAL DURATION:
365 DAYS
ACTUAL DURATION:
COMPLETION DATE:
________________________
Legacy Water Group, LLC
10130 Bob Williams Parkway
Covington, GA 30014
(678) 712-2132
Highway 72 Distribution Main
Laurens Co., SC.
This project consists of the installation of 58,200 lf of 16” water main and appurtenances in the road right-of-way, 2,382
lf of 18” directional drills to effectively cross wetland areas, 300 lf of 30” railroad jack and bores and 843 lf of 24” road
jack and bores.
LWG Project #: 1362
OWNER:
Laurens County Water & Sewer
3850 US Hwy. 221 S.
Laurens, SC. 29360
Mr. KC Price, P.E.
(864) 682-3250
ENGINEER:
Goodwyn, Mills & Cawood, Inc.
617 East McBee Ave.
Suite 200
Greenville, SC. 29601
Mr. John Raiford, PE
(864) 527-0460
PROJECT SUPERINTENDENT:
Scott Hibbard
ORIGINAL CONTRACT AMOUNT:
$4,396,255.00
$5,872,827.00 w/an Owner added Change Order
FINAL CONTRACT AMOUNT:
$6,064,887.50
ORIGINAL DURATION:
465 DAYS
ACTUAL DURATION:
394 days
________________________
Legacy Water Group, LLC
10130 Bob Williams Parkway
Covington, GA 30014
(678) 712-2132
2020 Newton County Annual Contracts Little River Sewer Interceptor & Annual Contract – Small Projects
Newton Co., GA.
Our contract consisted of Division 2 and Division 3 which included the installation of 1,189 lf of 15” PVC gravity sewer main and 12,960 lf of 18” PVC gravity sewer main from Little River Pump Station to the Northside of I-20. Depth of cuts ranged from 6’ to 26’. This project also included two 36” jack and bores. The first bore was 80’ long under SR 278 and the second was 420 lf under I-20. Both bores were successfully installed at minimum grade. An approved change order increased the original contract amount due to blasting and excavating 3,800 cy of rock.
LWG Project #: 1361-02 & 1361-3
OWNER:
Newton County Water & Sewer Authority
11325 Browns Bridge Rd.
Covington, GA 30016
Mr. Dom Fisher
(770) 385-3934 / (404) 987-3257
ENGINEER:
Georgia Water & Environmental Services, LLC
733 Carroll St.
Perry, GA. 31069
Mr. Burke Murph, PE
(478) 235-0307
PROJECT SUPERINTENDENT:
Scott Hibbard
ORIGINAL CONTRACT AMOUNT:
Division 2: $3,825,708.00
Division 3: $220,699.00
FINAL CONTRACT AMOUNT:
$4,110,000
ORIGINAL DURATION:
365 DAYS – ANNUAL CONTRACT
ACTUAL DURATION:
312 DAYS
________________________
Legacy Water Group, LLC
10130 Bob Williams Parkway
Covington, GA 30014
(678) 712-2132
Fort Gordon Cross Basin Lift Station & Force Main – Task Order Program
FG_2018-005
Augusta, GA.
This task order project consisted of the installation of 14,670 lf of 12” PVC sewage force main and one triplex pump station with 12’ x 10’ wet well 21’ deep with three (3) 150 hp pumps. Approved change orders added 1,228 lf of 18” DR 26 PVC gravity sewer.
LWG Project #: 1360
OWNER:
Augusta Utility Department
535 Telfair St.
Augusta, GA. 30901
Mr. Steve Behrend
(706) 821-2811 / (706) 312-5057
ENGINEER:
Goodwyn Mills & Cawood, Inc.
1450 Greene St., Suite 505
Augusta, GA. 30901
Mr. Graham Sizemore, PE
(706) 251-9099 / (803) 608-4297
PROJECT SUPERINTENDENT:
Scott Hibbard
ORIGINAL CONTRACT AMOUNT:
$3,086,045.00
FINAL CONTRACT AMOUNT:
$3,479,187.00
ORIGINAL DURATION:
270 DAYS
ACTUAL DURATION:
238 DAYS
COMPLETION DATE:
June 30, 2020
________________________
Legacy Water Group, LLC
10130 Bob Williams Parkway
Covington, GA 30014
(678) 712-2132
Back Hall Non-Potable Irrigation & Beautification – Task Order Program
FG_2019-004
Augusta, GA.
This task order project consisted of furnishing and installing an irrigation system and landscaping in a highly secure area
on Fort Gordon Army Base. No electronic devices or photos were allowed onsite.
LWG Project #: 1359
OWNER:
Augusta Procurement
535 Telfair St.
Augusta, GA. 30901
Mr. Chad Hendrix, PE
(706) 821-2355 / (706) 312-4126
ENGINEER:
Augusta Utilities Department
452 Walker Street, Suite 200
Augusta, GA. 30901
Mr. Chad Hendrix, PE
(706) 821-2355 / (706) 312-4126
PROJECT SUPERINTENDENT:
Gregg Hibbard
ORIGINAL CONTRACT AMOUNT:
$348,685.00
FINAL CONTRACT AMOUNT:
$366,911.00
ORIGINAL DURATION:
90 DAYS
ACTUAL DURATION:
120 DAYS
COMPLETION DATE:
January 25, 2020
________________________
Legacy Water Group, LLC
10130 Bob Williams Parkway
Covington, GA 30014
(678) 712-2132
WWTP (1.25 MGD) Upgrade, Division II
Unadilla, GA.
The project consisted of the installation of force main piping from the new WWTP site to the Land Application System spray field sites which includes the installation of 25,733 lf of 18″ PVC C900; 6,784 lf of 12″ PVC C900 and 9,180 LF of smaller diameter PVC, ranging in size from 1.5” up to 10”. This project also included center pivots and sprinkler systems, monitoring wells, and over 250 acres of Coastal Bermuda sprigging.
LWG Project #1358
OWNER:
City of Unadilla
563 West Railroad St.
Unadilla, GA. 31091
Myron Mixon, Mayor
(478) 627-3022
ENGINEER:
Hofstadter & Associates, Inc.
4571 Arkwright Rd.
Macon, GA. 31210
Chad Hofstadter, PE
(478) 757-1169
SUPERINTENDENT:
Gregg Hibbard
Tom Hannafin
ORIGINAL CONTRACT
AMOUNT:
$4,051,619.05
FINAL CONTRACT AMOUNT:
$4,164,398.01
ORIGINAL DURATION:
365 DAYS
ACTUAL DURATION:
365 DAYS
COMPLETION DATE:
July 1, 2022
________________________
Legacy Water Group, LLC
10130 Bob Williams Parkway
Covington, GA 30014
(678) 712-2132
North Lowndes & Spring Creek Water System Improvements
Lowndes Co., GA.
This project consisted of the construction of the North Lowndes and Spring Creek Water System Interconnection. It consisted of the installation of approximately 23,028 of 12″ – 16″ HDPE water main, valves, fittings, directional bores, jack and bores, fire hydrants, erosion control and all related measures required to complete the project installation.
LWG Project #: 1356
OWNER:
Lowndes County
Engineering Division
PO Box 1349/427 North Ashley Street
Valdosta, GA. 31601
(229) 671-2424
F: (229) 245-5299
ENGINEER:
Lovell Engineering Associates
PO Box 2830, Valdosta, GA. 31604
3998 Inner Perimeter Road, Ste. C
Valdosta, GA. 31604
Clayton Milligan
(229) 253-0900
F: (229) 253-1842
PROJECT SUPERINTENDENT:
Gregg Hibbard
ORIGINAL CONTRACT AMOUNT:
$3,889,825.23
FINAL CONTRACT AMOUNT:
$3,571,382.00
ORIGINAL DURATION:
250 DAYS
ACTUAL DURATION:
250 DAYS
COMPLETION DATE:
March 4, 2020
________________________
Legacy Water Group, LLC
10130 Bob Williams Parkway
Covington, GA 30014
(678) 712-2132
Mt. Gallant Waterline Extension (India Hook Rd to Museum Rd)
Rock Hill, SC.
This project included the installation of approximately 15,949 lf of 24″ water main including five bores, hydrant assemblies, service connections, clearing, erosion and sediment control and surface restoration. Additional work requested by City of Rock Hill required additional time and cost to complete.
LWG completed 90% of contract with our own workforce.
LWG Project #: 1355
OWNER:
City of Rock Hill
757 South Anderson Road
Rock Hill, SC. 29730
Mr. Mark Kettlewell
ENGINEER:
STV, Inc.
454 S. Anderson Road
Suite 3, BTC 517
Rock Hill, SC. 29730
Bert Becton, PE
(803) 656-2015
PROJECT SUPERINTENDENT:
Scott Hibbard
ORIGINAL CONTRACT AMOUNT:
$2,970,375.00
FINAL CONTRACT AMOUNT:
$3,130,707.00
ORIGINAL DURATION:
270 DAYS
ACTUAL DURATION:
330 DAYS
COMPLETION DATE:
March 5, 2020
________________________
Legacy Water Group, LLC
10130 Bob Williams Parkway
Covington, GA 30014
(678) 712-2132
Sawnee Drive Booster Pump Station,
Water Storage Tank & Water Main
Cumming, GA.
This project consisted of furnishing all materials, labor and equipment to construct one (1) booster pump station, one (1) ground water storage tank and the installation of 10,650 lf of 8″ water line.
LWG Project #: 1351
OWNER:
City of Cumming
100 Main St.
Cumming, GA. 30040
ENGINEER:
Civil Engineering Consultants, Inc.
4994 Lower Roswell Rd, Suite 17
Marietta, GA. 30068
(770) 977-5767
andy@cec.engineering
PROJECT SUPERINTENDENT:
Gregg Hibbard
ORIGINAL CONTRACT AMOUNT:
$1,984,350.00
FINAL CONTRACT AMOUNT:
$1,889,271.43
ORIGINAL DURATION:
240 DAYS
ACTUAL DURATION:
240 DAYS
________________________
Legacy Water Group, LLC
10130 Bob Williams Parkway
Covington, GA 30014
(678) 712-2132
Covington Town Center Utilities
Covington, GA.
As a subcontractor to Total Earth Services, LLC, this project consists of the installation of water, sanitary sewer and storm water utilities. Covington Town Center is located on Alcovy Road in Covington, GA.
LWG completed 90% of this contract with our own
workforce.
LWG Project #: 1349
OWNER:
City of Covington
2116 Stallings Street
Covington, GA. 30014
Ronnie Johnston
770) 385-2180
GENERAL CONTRACTOR:
Total Earth Services, LLC
110 South Church Street
Dublin, GA. 31021
Robert Rinker
(478) 304-1126
PROJECT SUPERINTENDENT:
Gregg Hibbard
ORIGINAL CONTRACT AMOUNT:
$2,639,077
FINAL CONTRACT AMOUNT:
$3,221,112.50
ORIGINAL DURATION:
365 DAYS
ACTUAL DURATION:
365 DAYS
________________________
Legacy Water Group, LLC
10130 Bob Williams Parkway
Covington, GA 30014
(678) 712-2132
Holley Ferry / Spann Water
Improvements – Phase 1
Saluda Co., SC. .
This project consists of two (2) divisions. Division 1 consists of constructing approximately 19,740 lf of 16” water main within the cleared roadway rights-of-way with appurtenances. Division 2 consists of constructing approximately 21,020 lf of 16” water main within the cleared roadway rights-of-way and one (1) stream crossing at Clouds Creek.
LWG completed 85% of this contract with our own workforce.
LWG Project #: 1348
OWNER:
Saluda County Water & Sewer Authority
106 North Jennings Street
Saluda, SC. 29138
Jason Fell, General Manager
(864) 445-9572
ENGINEER:
W.K. Dickson
1320 Main Street
Suite 400
Columbia, SC. 29201
Jeremy Bristow, PE
(803) 786-4261
PROJECT SUPERINTENDENT:
Scott Hibbard
ORIGINAL CONTRACT AMOUNT:
$3,987,388.95
FINAL CONTRACT AMOUNT:
$4,014,389
ORIGINAL DURATION:
210 DAYS
ACTUAL DURATION:
210 DAYS
________________________
Legacy Water Group, LLC
10130 Bob Williams Parkway
Covington, GA 30014
(678) 712-2132
Bucksnort Ranch Land Application
System, Harkness Sprayfields 6-10
Butts Co., GA.
This project consists of the expansion of the existing land
application sprayfields which included the installation of approximately 31,184 lf of 2″ HDPE, 1,906 lf of 3″ HDPE, 1,968 lf of 4″ HDPE, 1,658 lf of 6″ HDPE, 2,830 lf of 8″ HDPE and 2,324 lf of 10″ HDPE.
LWG completed 93% of this contract with our own
workforce.
LWG Project #: 1347
OWNER:
Butts County Et. Al. Water &
Sewer Authority
100 W. Second St.
Jackson, GA. 30233
ENGINEER:
Rindt-McDuff Associates, Inc.
334 Cherokee St.
Marietta, GA. 30060
Meg Mbugua, PE
(770) 427-8123
PROJECT SUPERINTENDENT:
Gregg Hibbard
ORIGINAL CONTRACT AMOUNT:
$1,213,481.32
FINAL CONTRACT AMOUNT:
$911,673
ORIGINAL DURATION:
365 DAYS
ACTUAL DURATION:
365 DAYS
________________________
Legacy Water Group, LLC
10130 Bob Williams Parkway
Covington, GA 30014
(678) 712-2132
City of Covington Housing Authority
Storm Drainage Improvements
Covington, GA.
Our contract included the removal of 1,660 lf of twin 54” CMP culverts and replaced with structural plate arch and concrete culverts.
LWG completed 95% of this work with our own workforce.
LWG Project #: 1345
OWNER:
City of Covington
Housing Authority
2116 Stallings St.
Covington, GA. 30014
Ronnie Johnston
(770) 385-2182
ENGINEER:
Georgia Water & Environmental Services
4875 Riverside Dr., Ste. 101
Macon, GA. 31210
Burke Murph, PE
(478) 235-0307
PROJECT SUPERINTENDENT:
Gregg Hibbard
ORIGINAL CONTRACT AMOUNT:
$1,094,535
FINAL CONTRACT AMOUNT:
$1,124,200
ORIGINAL DURATION:
180 DAYS
ACTUAL DURATION:
180 DAYS
________________________
Legacy Water Group, LLC
10130 Bob Williams Parkway
Covington, GA 30014
(678) 712-2132
Yellow River WWTP Pumping
Improvements & LAS Force Main
Newton Co., GA.
This contract consisted of the installation of a 75 hp submersible pump in the existing, empty slot of the Yellow River Influent Pump Station. This shall include all required hardware, wiring, parts, labor & testing. Installation of a throttling valve on the discharge side of the 24″ effluent force main and associated electrical. Installation of 8,255 lf of 16″ ductile iron force main, restrained joint bends, gate valves, combination air/vacuum valves and associated manholes, jack & bore with casing pipe, 6′ diameter effluent manhole, and appurtenances. Installation of 47 lf of 24″ ductile iron gravity outfall pipe and modify the concrete cascade structure entering the LAS holding pond. Installation of 155 lf of 4″ grout filled erosion control mattress, concrete interlocking blocking, and other appurtenances necessary for riverbank stabilization. Installation of erosion and sedimentation control best management practices along the new force main route from plant to LAS holding
pond.
LWG completed 85% of this contract with our own workforce
LWG Project #: 1344
OWNER:
Newton County Water &
Sewerage Authority
11325 Brown Bridge Rd.
Covington, GA. 30016
Chad Peden
(770) 385-3934
ENGINEER:
Georgia Water & Environmental Services, LLC.
1222 Main St.
Macon, GA. 31069
Steve Belcher, PE
(478) 235-4776
PROJECT SUPERINTENDENT:
Scott Hibbard
ORIGINAL CONTRACT AMOUNT:
$1,747,633.80
FINAL CONTRACT AMOUNT:
$1,666,121.61
ORIGINAL DURATION:
294 DAYS
ACTUAL DURATION:
294 DAYS
________________________
Legacy Water Group, LLC
10130 Bob Williams Parkway
Covington, GA 30014
(678) 712-2132
Covington DWSRF Water Main
Replacement Phase 3
Covington, GA.
This project consists of the installation of 22,000 lf of 12” and 8” DIP and PVC water main, fire hydrants, free bores, and appurtenances.
LWG completed 90% of this contract with our own workforce.
LWG Project #: 1343
OWNER:
City of Covington
2194 Emory St., NW
Covington, GA. 30014
Ronnie Johnston
(770) 385-2000
ENGINEER:
Rindt-McDuff Associates, Inc.
334 Cherokee St.
Marietta, GA. 30060
Richard Akin, PE
(770) 427-8123
PROJECT SUPERINTENDENT:
Gregg Hibbard
ORIGINAL CONTRACT AMOUNT:
$1,394,842
FINAL CONTRACT AMOUNT:
$1,330,316.76
ORIGINAL DURATION:
270 DAYS
ACTUAL DURATION:
270 DAYS
________________________
Legacy Water Group, LLC
10130 Bob Williams Parkway
Covington, GA 30014
(678) 712-2132
US 129 SR 11 Over Chattahoochee
Hall Co., GA. .
GDOT Project – As a subcontractor to E. R. Snell Contractors, Inc., our contract consisted of utility relocations for the US129/SR11 new bridge installations. The project consisted of the installation of approximately 12,400 lf of 20” DIP, 220 lf of 12” DIP, 2,400 lf of 8” DIP, 500 lf of 6” DIP and 3,500 lf of 12” sanitary sewer force main; 57 gate valves, including 20 – 20” gate valves; and 780 lf of jack and boring, including boring of 510 lf of 30” steel casing. Both water and sewer were hung under the new bridge decks. Legacy completed approximately 91% of this work with our own workforce.
LWG Project #: 1342
OWNER:
City of Gainesville
757 Queen City Pkwy, SW
Gainesville, GA. 30501
Joel Altherr, Project Manager/Civil Engineer II
(770) 538-2466
GENERAL CONTRACTOR:
E. R. Snell Contractor, Inc.
1785 Oak Road
Snellville, GA. 30078
Tommy Clower
(770) 985-0600
PROJECT SUPERINTENDENT
Tom Hannafin
ORIGINAL CONTRACT AMOUNT:
$2,647,294
FINAL CONTRACT AMOUNT:
$2,795,026.09
ORIGINAL DURATION:
710 DAYS
ACTUAL COMPLETION DATE:
May 14, 2020
________________________
Legacy Water Group, LLC
10130 Bob Williams Parkway
Covington, GA 30014
(678) 712-2132
Gwinnett Call 39 for Georgia DOT
Gwinnett Co., GA.
This GDOT contract was awarded to Pittman Construction
Co., Inc. As a subcontractor to Pittman Construction, our contract consisted of utility relocations for State Roads 124 & 78 realignment. Installation of 1,445 lf of 6″ & 8″ sewer lines and 1,494 lf of 6″, 10″, 12″, 16″ and 24″ water mains including valves, hydrants and services.
LWG completed approximately 95% of this work with our own workforce.
LWG Project #: 1341
OWNER:
Gwinnett County Department of Water Resources
684 Winder Highway
Lawrenceville, GA. 30045
(678) 376-6700
GENERAL CONTRACTOR:
Pittman Construction Co.
1487 Farmer Rd.
Conyers, GA. 30012
Jim Bronaugh
(770) 922-8660
ENGINEER:
Gresham, Smith & Partners
2325 Lakeview Parkway
Alpharetta, GA. 30009
(770) 754-0755
PROJECT SUPERINTENDENT:
Tom Hannafin
ORIGINAL CONTRACT AMOUNT:
$873,291
FINAL CONTRACT AMOUNT:
$704,676
ORIGINAL DURATION:
Sub – Start date 3/15/2018
ACTUAL DURATION:
Sub – Completion 9/25/2019
________________________
Legacy Water Group, LLC
10130 Bob Williams Parkway
Covington, GA 30014
(678) 712-2132
Rock Creek Relief Sewer Bid Item #17-201
Augusta, GA
This project consisted of rock excavation, erosion control and permanent grassing, traffic control and installation of 10,030 lf of 20” DIP HDPE Force Main DR 17, 80 lf of 30” jack and bored steel casing at Riverlook Drive, 90 lf of 30” jack and bored steel casing at CSX Railroad, 50 lf of 8” DIP water transmission main, 80 lf of 16” jack and bored steel casing, manholes, valves, fire hydrants and a 2,600 GPM duplex cast-in-place pump station.
LWG Project #: 1339
OWNER:
Augusta Procurement
535 Telfair Street
Augusta, GA. 30901
Mr. Chad Hendrix, PE
(706) 821-2355 / (706) 312-4126
ENGINEER:
Zimmerman, Evans & Leopold, Inc.
435 Telfair Street
Augusta, GA. 30901
Mr. Jorge E. Jimenez, PE
(706) 724-5627
PROJECT SUPERINTENDENT:
Scott Hibbard
ORIGINAL CONTRACT AMOUNT:
$4,250,208.00
FINAL CONTRACT AMOUNT:
$4,056,627.01
ORIGINAL DURATION:
270 DAYS
ACTUAL DURATION:
270 DAYS
________________________
Legacy Water Group, LLC
10130 Bob Williams Parkway
Covington, GA 30014
(678) 712-2132
Forsyth Transmission Main Bid #17-49-3340
Forsyth County, GA
This project consisted of the construction of new transmission mains described as follows:
- CIP 102: Installation of approximately 3,191 lf of 36” water force main along Doc Bramblett Rd.
- CIP 103: Installation of approximately 7,450 lf of 36” water force main along Roper Rd.
- CIP 107: Installation of approximately 7,385 lf of 36” water force main along Burress Mill Rd.
- CIP 108: Installation of approximately 3,527 lf of 12” water force main along Parks Rd.
- CIP 112: Installation of approximately 420 lf of 8” water force main across the intersection of Dawsonville Hwy. and Crystal Cove Trail
LWG Project #: 1338
OWNER:
Forsyth County Board of Commissioners
110 E. Main Street
Cumming, GA. 30040
Mr. Jim Neuhaus
(770) 888-8872
ENGINEER:
Black & Veatch
50 Hurt Plaza, SE, Ste. 1150
Atlanta, GA. 30303
(770) 5218105
PROJECT SUPERINTENDENT:
Tom Hannafin
ORIGINAL CONTRACT AMOUNT:
$5,313,892.00
FINAL CONTRACT AMOUNT:
$5,308,211.57
ORIGINAL DURATION:
360 DAYS
ACTUAL DURATION:
345 DAYS
________________________
Legacy Water Group, LLC
10130 Bob Williams Parkway
Covington, GA 30014
(678) 712-2132
Oconee Veterans Park Pump Station & Force Main FY1704-19
Oconee County, GA
This project included the construction of 125 GPM duplex submersible pump station with valve vault and the installation of
- approximately 5,112 lf of 4” force main
- 290 lf of 12” steel casing for road crossing
- 360 lf of 8” PVC gravity sewer
- 80 lf of 16” steel casing for road crossing
OWNER:
Oconee County Utility Department
1291 Greensboro Hwy.
Watkinsville, GA. 30677
(706) 769-3960
ENGINEER:
Barge, Waggoner, Sumner &
Cannon, Inc.
5445 Triangle Pkwy., Ste. 240
Peachtree Corners, GA. 30092
(678) 515-9411
PROJECT SUPERINTENDENT:
Gregg Hibbard
ORIGINAL CONTRACT AMOUNT:
$584,570.00
FINAL CONTRACT AMOUNT:
$476,995.28
ORIGINAL DURATION:
120 DAYS
ACTUAL DURATION:
120 DAYS
________________________
Legacy Water Group, LLC
10130 Bob Williams Parkway
Covington, GA 30014
(678) 712-2132
Northeast Force Main Phase II
Madison, AL
This project consisted of the installation of:
- approximately 16,900 lf of 14” DR17 HDPE force main
- horizontal directional drilling
- air releases
- gate valves
- riprap
- clearing, asphalt paving, grassing and cleanup.
OWNER:
Madison Utilities
101 Ray Sanderson Dr.
Madison, AL. 35758
Emory DeBord
(256) 772-0253
ENGINEER:
Engineers of the South
2143 Arlington Blvd.
Ste. 3
Florence, AL. 35630
Mr. Craig Swinney, PE
(256) 766-9430
SUPERINTENDENT:
Gregg Hibbard
ORIGINAL CONTRACT AMOUNT:
$2,046,586
FINAL CONTRACT AMOUNT:
$1,919,508
ORIGINAL DURATION:
240 DAYS
ACTUAL DURATION:
210 DAYS
________________________
Legacy Water Group, LLC
10130 Bob Williams Parkway
Covington, GA 30014
(678) 712-2132
Southern Bypass Water System Improvements, Phase 1
Fort Mill, SC
This project was designed and built to provide a water main for the Town of Fort Mill to improve distribution and improve Town water tank levels. This project featured the following elements:
- 8,700 lf of 24” DIP water main
- 60 lf of 16” DIP water main
- 20 lf of 12” DIP water service
- 110 lf of 8” DIP water service
- 315 lf of 36” diameter jack and bored steel casing
- 55 lf of 24” diameter jack and bored steel casing
- 75 lf of 16” diameter jack and bored steel casing
- Water main appurtenances including hydrants, air release valves, and blow-off assemblies
- 2 permitted stream crossings
- Project finished under budget due to unused contingency, allowances, etc.
- Substantial Completion was achieved on time and the water line was successfully placed into operation.
- 92% of this work was completed by Legacy’s own workforce
Project Profile
OWNER:
Town of Fort Mill
131 E. Elliot St.
Fort Mill, SC. 29715
Mr. Greg Rushing
(803) 396-9729
ENGINEER:
Keck & Wood, Inc.
215 Hampton St.
Suite 100
Rock Hill, SC. 29730
Mr. John Primm, PE
(803) 620-1300
SUPERINTENDENT:
Scott Hibbard
ORIGINAL CONTRACT AMOUNT:
$1,637,150.78
FINAL CONTRACT AMOUNT:
$1,574,795
ORIGINAL DURATION:
180 DAYS
ACTUAL DURATION:
193 DAY
________________________
Legacy Water Group, LLC
10130 Bob Williams Parkway
Covington, GA 30014
(678) 712-2132
Veterans Parkway Water & Sewer Improvements, Contract 1
Toccoa, GA
This project generally consists of the following:
- New 500 gpm Sewerage Lift Station
- 15,100 LF 12″ Water Main
- 10,200 LF 6″ HDPE Sewerage Force Main
- 1,650 LF 8″ PVC Sewerage Gravity Flow
- 540 LF of 12″ Steel Casing installed by jack and bore
- 640 LF of 16″ Steel Casing installed by jack and bore
- 540 LF of 24″ Steel Casing installed by jack and bore
- 3,600 LF of 12” HDPE installed by directional bore
- 1,800 LF of 6″ HDPE installed by directional bore
- Installation of new wet well and mechanical piping for a future pump station
- 80% of this work completed by our own workforce
OWNER:
City of Toccoa
92 N. Alexander St.
Toccoa, GA. 30577
Mr. Billy Morse
(706) 886-8451
ENGINEER:
Goodwyn, Mills & Cawood, Inc.
2430 Herodian Way, SE
Suite 101
Smyrna, Ga. 30080
Mr. Tim Blaydes, PE
(770) 952-2481
SUPERINTENDENT:
Scott Hibbard
ORIGINAL CONTRACT AMOUNT:
$3,332,497.50
FINAL CONTRACT AMOUNT:
$3,538,858.50
ORIGINAL DURATION:
365 DAYS
ACTUAL DURATION:
365 DAYS
________________________
Legacy Water Group, LLC
10130 Bob Williams Parkway
Covington, GA 30014
(678) 712-2132
Glass Factory Relief Low Pressure
Sewer
Augusta, GA
This project consisted of the installation of a new low pressure/siphon force main system which included:
- 2,700 lf of 24” HDPE force main
- 950 lf of 30” DR 26 PVC gravity sanitary sewer
- 250 lf of 24” DIP gravity sewer
- a new duplex pump station in a 12’x 12’ wet well with rated capacity of 1,260 gpm
- a new discharge structure
- connection to an existing 84” brick sewer, including all electrical, SCADA and telemetry.
OWNER:
Augusta Procurement
535 Telfair St.
Augusta, GA. 30901
Mr. Tom Weidmeier
(706) 821-2355
ENGINEER:
Zimmerman, Evans & Leopold, Inc.
435 Telfair St.
Augusta, GA. 30901
Mr. Mitchell E. Freeman, PE
(706) 724-5627
SUPERINTENDENT:
Scott Hibbard
ORIGINAL CONTRACT AMOUNT:
$2,320,000
FINAL CONTRACT AMOUNT:
$2,294,727.71
ORIGINAL DURATION:
240 DAYS
ACTUAL DURATION:
210 DAYS
Completion Date: April 25, 2017
________________________
Legacy Water Group, LLC
10130 Bob Williams Parkway
Covington, GA 30014
(678) 712-2132
Merrimont Subdivision & Jacks Creek
Road Water Mains
Walton, GA
This project consisted of furnishing all labor, equipment, and materials to install:
- approximately 15,000 lf of 8” DIP water mains
- 1,200 lf of 6” DIP water mains
- and appurtenances
OWNER:
Walton County Board of Commissioners
11 South Broad St.
Monroe, GA. 30655
(770) 267-1301
ENGINEER:
Precision Planning, Inc.
802 East Spring St.
Monroe, GA 30655
Mr. Jimmy Parker
(770) 267-8800
PROJECT SUPERINTENDENT:
Scott Hibbard
ORIGINAL CONTRACT AMOUNT:
$693,845.00
FINAL CONTRACT AMOUNT:
$693,845.00
ORIGINAL DURATION:
120 DAYS
ACTUAL DURATION:
120 DAYS – Complete
________________________
Legacy Water Group, LLC
10130 Bob Williams Parkway
Covington, GA 30014
(678) 712-2132
Camp Creek Water Transmission Main Road Water Mains
Cornelia, GA
This project consists of furnishing all labor, equipment, and materials to install:
- approximately 3,150 lf of 18” DIP and 450 lf of 10” DIP water line complete with fire hydrants, valves
- reconnection of existing water services
- driveway replacement
- roadway replacement
- earthwork, grassing, soil erosion and sedimentation control, and appurtenances
OWNER:
City of Cornelia
181 Larkin St.
Cornelia, GA 30531
Mr. Donald Anderson
706) 778-8585
ENGINEER:
Carter & Sloope
1031 Stonebridge Parkway
Watkinsville, GA 30677
Mr. Chase West, PE
(706) 769-4119
PROJECT SUPERINTENDENT:
Gregg Hibbard
ORIGINAL CONTRACT AMOUNT:
$598,634.50
FINAL CONTRACT AMOUNT:
$598,634.50
ORIGINAL DURATION:
90 DAYS
ACTUAL DURATION:
90 DAYS – Complete Sept. 18, 2016
________________________
Legacy Water Group, LLC
10130 Bob Williams Parkway
Covington, GA 30014
(678) 712-2132
GITI New Passenger Car Tire Plant
Richburg, SC
This project included the following site utilities:
- Installation of approximately 9,000 lf of 12” Fire Main w/appurtenances
- Installation of approximately 3,000 lf of 8” Domestic Water Mains
- Installation of approximately 3,000 lf of Gravity Sewer With connections
- 90% of work completed by Legacy Water Group, LLC.
- Legacy Water Group, LLC was a subcontractor to
Brad Cole Construction Co., Inc. 2250 Lovvorn Rd.,
Carrollton, Ga. 30117 Contact: Mr. Tadd Swartz
(770) 834-4681
Project Profile
OWNER:
Shimizu North America, LLC.
100 Parkwood Circle, Ste. 820
Atlanta, GA. 30339
Mr. Jim Van Vegten
(770) 956-1123 or (502) 542-2121
ENGINEER:
Gresham Smith & Partners
(617) 770-8100
PROJECT SUPERINTENDENT:
Scott Hibbard
ORIGINAL CONTRACT AMOUNT:
$1,324,424
FINAL CONTRACT AMOUNT:
$1,429,886.35
ORIGINAL DURATION:
120 DAYS
ACTUAL DURATION:
90 DAYS
________________________
Legacy Water Group, LLC
10130 Bob Williams Parkway
Covington, GA 30014
(678) 712-2132
Glade Road Area Sewer System
Phase 1
Bartow County, GA
- Installation of 5,250 lf of 8” PVC and Ductile Iron Gravity Sewer
- Installation of 9,600 lf of 6” and 8” PVC and DIP Force Main
- 3 sewage pump stations
- 375 GPM
- 350 GPM
- 181 GPM
- Approximately 1,800 cy of rock excavation
- 90% of work completed by Legacy Water Group, LLC.
Project Profile
OWNER:
Bartow County Water Department
135 W. Cherokee Ave.
Cartersville, GA. 30120
Mr. Gene Camp
(770) 387-5170
ENGINEER:
Peoples & Quigley, Inc.
6059 Boylston Dr., NE
Sandy Springs, GA. 30328
Mr. Robert Peoples, P.E.
(404) 255-2650
PROJECT SUPERINTENDENT:
Scott Hibbard
ORIGINAL CONTRACT AMOUNT:
$2,535,107
FINAL CONTRACT AMOUNT:
$2,535,107
ORIGINAL DURATION:
270 DAYS
ACTUAL DURATION:
270 DAYS – Completed Feb. 28, 2017
________________________
Legacy Water Group, LLC
10130 Bob Williams Parkway
Covington, GA 30014
(678) 712-2132
Water System Improvements to Serve
Southeast Silvertown Village
Thomaston, GA
This project consisted of the following:
- Installation of 7,400 lf of 12” water main
- Installation of 7,300 lf of 8” DIP water main
- Installation of 5,800 lf of 6” DIP water main
- Installed 204 water service transfers
- 4,900 sy of asphalt road replacement
- 5,800 sy of sidewalk replacement
Project Profile
OWNER:
City of Thomaston
106 East Lee Street
Thomaston, GA 30286
Mr. Patrick Comiskey
(706) 647-4242
ENGINEER:
Carter & Sloope
6310 Peake Rd.
Macon, GA 31210
Mrs. Claire Swaim
(478) 477-3923
PROJECT SUPERINTENDENT:
Gregg Hibbard
ORIGINAL CONTRACT AMOUNT:
$2,794,269
FINAL CONTRACT AMOUNT:
$2,338,604
ORIGINAL DURATION:
240 DAYS
ACTUAL DURATION:
240 days
________________________
Legacy Water Group, LLC
10130 Bob Williams Parkway
Covington, GA 30014
(678) 712-2132
Kingsland North Lift Station and Force Main
Kingsland, GA
- 1,600 gpm lift station in 8’ diameter precast lined wet well, 26’ feet deep requiring well points and slide rail for installation. Lift station utilized KSB submersible pumps
- 5,000 lf 12” HDPE sewage force main
- 16,000 lf 14” HDPE sewage force main
- 3,000 lf 18” HDPE sewage force main
- 750 lf 18” and 24” jack and bored steel casing
- Jack and bores included crossings of GA Highway 40 and S. Mary’s Railroad
- Cut in connections to existing 10” and 24” force mains
- 7,400 lf of the force main was installed in designated wetlands requiring adhering to special permit conditions
- 72% of the work was completed by Legacy Water Group
Project Profile
OWNER:
City of Kingsland, GA
107 South Lee Street
Kingsland, GA 31548
Mr. Bill Coleman
(912) 552-4020
ENGINEER:
Carter & Sloope
6310 Peake Road
Macon, GA 31210
Mr. Trey Gavin
(478) 477-3923
ORIGINAL CONTRACT AMOUNT:
$2,496,900
FINAL CONTRACT AMOUNT:
$2,444,686
ORIGINAL DURATION:
240 DAYS
ACTUAL DURATION:
240 DAYS – January 26, 2016
________________________
Legacy Water Group, LLC
10130 Bob Williams Parkway
Covington, GA 30014
(678) 712-2132
East Newton Water Transmission Main
Social Circle, GA
Built to provide a redundant water source for the new Baxter
Pharmaceutical plant in Walton County. Major project features
include the following:
- 9,500 lf 12” DIP water main
- 16,500 lf 16” DIP water main
- 430 lf 14” HDPE directional drill
- 110 lf 18” jack and bored steel casing
- 340 lf 24” jack and bored steel casing under I-20
- Project involved work with GA DOT R.O.W. along GA Hwy 11
- 2 ea. wet taps to existing water lines
- 90% of the work was completed by Legacy Water Group
- Final contract overrun was due to an approved change
order to install an additional 300 lf of directional drill
Project Profile
OWNER:
Newton County Water & Sewer Authority
11325 Browns Bridge Rd.
Covington, GA 30016
Mr. Chad Peden
(770) 385-3934
ENGINEER:
Carter & Sloope
1031 Stonebridge Parkway
Watkinsville, GA 30677
Mr. Chase West
(706) 769-4119
ORIGINAL CONTRACT AMOUNT:
$1,859,337
FINAL CONTRACT AMOUNT:
$1,871,632
ORIGINAL DURATION:
200 DAYS
ACTUAL DURATION:
178 DAYS – Complete July 2, 2015
________________________
Legacy Water Group, LLC
10130 Bob Williams Parkway
Covington, GA 30014
(678) 712-2132